Stay One Step Ahead. From End-to-End.

Global Expertise, Localized Fluid Solutions

— Resources — Case Studies

Explore Our Recent Wins

Filter By

Middle East, Offshore

Even Unplanned 27-Day Delay Can’T Destabalize Kronos Cw

Unplanned 27-day logging program put the low sag factor and gel properties of flat rheology Kronos CW (critical wells) NAF to the test.
read case study

Marcellus Shale, USA

Teros: 33% Increase In Feet Drilled Per Day And Reduced Overall Well Costs

Modeling with ClearTrack hydraulic software and customized Teros™ Low ECD NAF increase drilling performance and efficiency
read case study

Gulf of Mexico

Kronos Low Ecd Synthetic-Based Mud: 114 Hours Static At 40° Inclination

No sag events experienced once ramping up the pumps after 114 hours static downhole conditions after top drive failure.
read case study

Australia, Deepwater

Kronos Delivers Low-Ecd Performance For A Series Of 12 ¼” Sections

Flat rheological profile and low, flat gel strength enabled successful liner run and cementing while exceeding high operator expectations.
read case study

Algeria

Cross-Linked Polymer-Based Settable Pill Solves Severe Downhole Losses And Protects Sensitive Formation

Custom-developed settable pill succeeds in regaining circulation without any losses eliminating NPT and high costs where 16 conventional LCM pills failed
read case study

Adriatic Sea

Stuck pipe-freed in just 2 hours. 16 hours faster than operator expectations.

Hydrocarbon-free, low-toxicity pipe-freeing pill solution formulated onsite gets drilling back on track fast.
read case study

Onshore Oman

Anticipating Challenges To Go More Than 80 Wells Without A Critical Issue

Shale inhibition, hole cleaning and stuck pipe challenges mitigated on 81 well campaign for major operator.
read case study

Lake Washington

Total Losses Successfully Remediated And Full Fluid Returns Regained

Our specialists engineer solutions to solve total losses in sands and fracture formation in highly technically challenging well.
read case study

Italy

Dedicated LMP increases efficiency and lowers well costs

Build of new sustainable LMP facility for Italian operator delivered safely and on-schedule
read case study
Experts You Can Trust

How Can We Help You?

Global HQ

21920 Merchants Way

Katy, TX 77449

North America Sales

+1 346-888-8700

International Sales

+973-3221-6146

(optional)
Drop files here or
Max. file size: 50 MB.
    Would you like to receive marketing emails from Newpark?(Required)
    These may include product updates, promotions, and company news.

    You can unsubscribe at any time via the link in our emails or by contacting us.